PROJECTS

BART Berryessa Extension
Installed a complete fire standpipe system at the Dixon Landing, Milpitas Station Overcrossing, Trade Zone, Hostetter Road, Sierra & Lundy Ave.'s and Mabury Rd.





Sacramento Regional Wastewater Treatment Plant - Biological Nutrient Removal
Installed a complete fire sprinkler system in the three separate structures making up the BNR project - the Basin, ACC-52 and Blower buildings





Rinconada Water Treatment Plant
Installed a complete fire sprinkler system on the three separate structures making up the Rinconada project, to include a wet, dry, and pre-action system(s)





Riverside Public Defenders Building
Installed a complete fire sprinkler system, standpipe, and Horizontal split case fire pump floor for structure





Burroughs High School
Installed a Clean Agent System for the Science Labs





Los Angeles Community College District - Los Angeles Harbor College
Installed a complete fire sprinkler system in the three separate structures making up the Harbor Teacher Preparation Academy





Saugus High School Auditorium
Installed a complete fire sprinkler system in the new auditorium





Los Angeles Community College District - East Los Angeles College
Installed a complete fire sprinkler system in the Math & Science Center, Lecture Hall, and Science building





Riverside Community College District - Centennial Plaza
Installed a complete fire sprinkler system in the two separate buildings and parking structure





Irvine Unified School District - Heritage Fields K-8 School
Installed a complete fire sprinkler system for the five separate buildings making up Heritage Fields K-8 school





Metropolitan Water District - FE Weymouth Facility
Installed the second system for the FE Weymouth Maintenance building





Irvine Unified School District - Portola Springs Elementary
Installed a complete fire sprinkler system for the six separate buildings that is Portola Springs Elementary





LAC+USC Medical Center
Installed a Tenant Improvement Junior system protecting the 4th & 5th floors of the Phlebotomy clinic





Riverside Community College District - Riverside City College
Installed a new complete fire sprinkler system for the new Student Services & Administration Building





Los Angeles Community College District - LA Southwest College
Installed a complete new fire sprinkler system for the SoCTE Building, School of Career & Technical Education





Los Angeles Community College District - LA Valley College
Installed a complete new fire sprinkler system for the Athletic Facilities building




College of the Desert - Applied Sciences & Agricultural Building
Installed a complete new fire sprinkler system for the new Applied Sciences & Agricultural Buildings





Saddleback High School
Installed a complete new fire sprinkler system for the 27,000 SF new High School building achieving a LEED rating








Montebello Unified School District - Schurr High School
Installed a new fire sprinkler system for the band room







UC Santa Cruz - Wildlife Veterinary Care Center
Our removed the recalled sprinkler heads and replaced with new code compliant heads with zero loss of property or time loss to existing facilities operations





Los Angeles County - Los Nietos Library
Installed a complete new Pre-Action Fire Suppression System protecting the new library





IUSD Central Kitchen & Culinary Arts
Installed a complete new fire suppression system for the IUSD Central Kitchen & Culinary Arts building





Lomita Library Community Center
Installed a complete new fire suppression system for the new Lomita Library Community Center





UCLA CHS Telemedicine
Installed a new complete fire suppression system on three floors of the newly renovated telemedicine clinic





LAUSD Chatsworth High School
Installed a seismic loop for the schools elevator modernization





Tehachapi Critical Access Replacement Hospital
Installed a complete fire sprinkler system to include wet pipe fire suppression system, Dry Pipe systems, Pre-Action systems, and a Clean Agent FM-200 system for the three buildings making up the Tehachapi Hospital





Ronald M. George Office Complex
1,030,000 SF, The Ronald M. George Office Complex is a fourteen story steel framed building, that houses the CA Supreme Court, Industrial Relations Board, Department of Justice, and other Elected officials. First Responder removed the compromised sprinkler heads and reinstalled with new, as well as Re-Certified the buildings fire sprinkler system





College of the Desert - Indio Educational Center
Installed a complete fire sprinkler system to include a wet standpipe, wet pipe fire suppression system, and three different Pre-Action systems for the three story building. The building will be designed to achieve a LEED rating certification





BART A-Line Earthquake Retrofit 
Reconfigured wet standpipe to be in accordance with the code as well as accommodating the retrofit





Rowland Heights Community Center
Installed a complete fire sprinkler system for the Rowland Heights Community Center's two separate buildings, Bldg. A & B which comprise the RHCC. The building will be designed to achieve a LEED rating certification





Washington Elementary School
Performed the Tenant Improvement to Washington elementary school's new elevator and elevator equipment room. Installed all necessary overhead piping and finish heads to allow the new elevator T.I. to be in compliance with the code & AHJ






Olive Garden
Installed a complete fire sprinkler system for the Buena Park, Olive Garden restaurant





Shore Bar
Installed a complete fire sprinkler system for the Santa Monica, Shore Bar to include the Underground feed




Southern California Logistics Airport
Installed a new fire sprinkler system for the tenant improvement project adding two new administrative offices





MLK Hospital
Performed the Tenant Improvement for the fire sprinkler system at the MLK Hospital's Unit G Upgrade  





El Toro Market
Performed annual inspection on the buildings fire sprinkler system per NFPA 25 requirements

 




Fern Elementary School Modernization 
Removed the existing partially sprinkled fire system due to lack of code compliance. Our team then installed a new, complete wet fire suppression system to allow for the state certified historical building which is home to Fern Elementary; to now be in compliance with the local authority having jurisdiction 





Junipero Serra State Building
Performed repairs to the high rises Fire Pump, Fire Pump controller, and Jockey pump





Los Angeles County Fleet Offices - Tenant Improvement
Performed tenant Improvement on the warehouse; to provide a new fire sprinkler system protecting the Fire Dept. division






Fallbrook High School / Palomar College 
Performed all repairs to the campuses 12 fire systems, as well as re-certifying the campuses fire systems to be in code compliance. We also certified the fire system's back-flow






Norco College - Operations Center
The new Operations Center is the hub of the Norco campus. The building will house facilities and maintenance operations. The building will be designed to achieve a LEED rating certification






Classic Wire Cut
Provided quarterly inspection services, as well as adding a new fire sprinkler system for the tenants new clean room project








El Taurino Restaurant
Provided new fire sprinkler coverage to the restaurant's tenant improvement project






King Taco 
Our team responded to an emergency call on a broken underground main. Our technicians were on site within 1 hour of the initial call, and had the trench dug, broken pipe removed, and new pipe installed in just a few hours! 





Viking River Cruises
Performed tenant improvement for both the Wet & Pre-Action fire systems in accordance with the building renovation




California State University - East Bay 
Performed 5 year wet fire suppression system inspection in accordance with California Title 19 fire code, on multiple buildings





Miramar College - College Services Center
Installed complete wet fire suppression system in the Miramar College Services Center three buildings. The building will be designed to achieve a LEED rating certification





College of the Desert - Communications Building
Installed complete wet fire suppression system in College of the Desert - Communication bldg. designed with a LEED rating certification





Arcadia City Hall
Installed complete wet fire suppression system in the Arcadia City Hall Upper & Lower buildings





Montage Resort 
Our technicians installed the fire suppression system protecting the refrigeration storage units, as well as replacing a portion of their standpipe system






Personal Residence, Laguna Beach, CA
Service and Repair job on the personal residence located in Laguna Beach, CA. Our team members completed the job on time with zero property damage. Property was fully furnished at time of service





Ronald Reagan State Building 
Standpipe leak was repaired during normal business hours. Standpipe piece repaired was a 6" schedule 40 horizontal bulk feed pipe twenty one feet above finish floor and sixteen feet in length. This piece was also above all existing duct-work, plumbing and electrical runs; yet First Responder Fire's technicians had zero property damage!

 


John Paul Mitchell Systems
Repair of the JPMS warehouse facilities "In-Rack" damaged main line. Our team also performed the tenant improvement project that added an overhead fire sprinkler system protecting the JPMS product innovation salon addition





Department of Motor Vehicles - Turlock, California
Service and Repair job on the DMV of Turlock, CA. Our team completed all repairs, moved fire sprinkler heads to maintain the building's code compliance, as well as performing a 5 year inspection




Los Angeles City College - Fire Science Tech Quad
Installed a complete wet fire suppression system, to include the underground feed for the Fire Science Tech Quad Modular building. Our team also rerouted an on-site fire hydrant





Mesa College - Continuing Education Linda Vista Building
 The "Linda Vista" building is Type II B construction fully sprinkled with a structural steel frame, and was designed utilizing a fully 3-D Building Integrated Modeling design. The building is on track to receive LEED Gold certification